Multi Regional Coupling expanded by the end of 2020

17.12.2019

The Multi Regional Coupling (MRC) of the European electricity market is to be substantially enhanced by connecting the so-called 4M Market Coupling Countries (4M MC), i.e. the Czech Republic, Hungary, Romania and Slovakia, to the Europe-wide MRC. This will establish Single Day-Ahead Coupling across 23 European countries.

In preparation for this market integration, the so-called Interim Coupling Project (DE-AT-PL-4M MC Project) was launched. It has now completed the design phase and is entering the implementation phase. This provides the Nominated Electricity Market Operators (NEMOs) and transmission system operators (TSOs) from Austria (APG), Germany (50Hertz, Amprion, TenneT, and TransnetBW), Poland (PSE) and the 4M MC countries (ČEPS, MAVIR, Transelectrica and SEPS) with a sound basis for announcing the MRC inclusion for the third quarter of 2020.

The AT-PL-4M MC Project introduces implicit capacity allocation based on Net Transfer Capacity (NTC) at six borders (PL-DE, PL-CZ, PL-SK, CZ-DE, CZ-AT, HU-AT). The competent National Regulatory Authorities (NRAs) welcome the progress made and the synergies from the project, which will facilitate the introduction of Flow-Based Market Coupling in the Core Capacity Calculation Region (Core CCR), which is the ultimate target.

The AT-PL-4M MC project for integrating Czechia, Hungary, Romania and Slovakia into MRC has entered the implementation phase.

Linkup
> See PSE press release (html)
> See SEPS press release (html)
> Open joint press release (pdf, 216.14kB)