RGI demands stable mandates

29.09.2014

In an open letter to Jean-Claude Juncker, the President-elect of the European Commission the Renewables-Grid-Initiative (RGI) calls to secure a “sound and clear legislation for nature and climate protection” and to “streamline the procedures to properly develop the electricity grids throughout Europe”. The TSC members 50Hertz, Swissgrid and TenneT are three of the RGI partners.

> See RGI letter (html)

See article on single page

Full membership for MAVIR

25.09.2014

Hungary’s TSO, MAVIR Hungarian Independent Transmission Operator Company Ltd. has now been granted full membership of the TSO Security Cooperation. MAVIR is the 13th TSC member and of high importance for the European grid stability, especially because of its strong linking with the south-eastern European countries.

> See TSC press release (pdf)

 

See article on single page

A snapshot a day

15.09.2014

TSC today announced the beginning of the trial phase of the Real Time Snapshot (RTSN) project: Once a day every Transmission System Operator (TSO) submits a snapshot showing its grid status and load-flow situation close to real time. The different snapshots get merged and are used to check forecast data of the operational planning processes against real-time data. In the future this should be done on an hourly basis. The RTSN models are also usefull for the TSC quality management. Swissgrid, the Swiss TSO is not only providing parts of its IT resources, but has participated in developing the process.

See article on single page

Poster site in Paris

29.08.2014

The biennial CIGRE Session in Paris, France is one of the world’s most important grid events. This year a group of experts from Coreso and several TSC TSOs presented a paper about “European TSOs’ cooperation for enhanced system security, integration of renewables and market support”. On 29 August they took also part in one of the so-called Poster Sessions (C2-113).

> See CIGRE Session website

See article on single page

Having an European say

26.08.2014

Since stakeholder interaction is one of the key components in much of ENTSO-E’s work, there are currently three open public consultations, for which stakeholders are asked to contribute. A triple chance to speak one’s piece.

> Public Consultation on the Annual Work Programme 2014-2015 (until 29 August)

> Public Consultation on Adequacy Methodology (until 19 September)

> Public Consultation on the Ten-Year Network Development Plan 2014 (until 20 September)

 

See article on single page

Juncker sets his sights on “Energy Union”

16.07.2014

The European Parliament selected Jean-Claude Juncker as the new president of the European Commission, succeeding Jose Manuel Barroso. Juncker now declared that he wants to “reform and reorganise Europe’s energy policy in a new European Energy Union” with pooled resources and combined infrastructures. Moreover he wants “Europe’s Energy Union to become the world number one in renewable energies”.

> See Jean-Claude Juncker’s “Priorities”
> Open Jean-Claude Juncker’s “Political Guidelines” (pdf)

See article on single page